The brickies are now nearing completion. Although we had some pretty foul weather over the last few weeks our brickies have worked wonders to catch up and have just the west side first floor (above the garage side) to complete! They are amazing brickies and have done a fantastic job of the brickwork.
bricking being completed 9/7/11 |
rear of the house bricking on the 11/7/11 |
Front of house bricked! Just top balcony/portico to go! 16/7/11 |
Rear of house all bricked! 16/7/11 |
brickwork on our terrace 16/7/11 |
View of the Dandenongs from East side of terrace (once the modwood goes up it will obscure the neighbours shed but we should still be able to get the view of the hills) |
Ducting in roof space (viewed from bedroom 3) |
Ducting in roof space above master bedroom |
All the shower bases have also been installed in the ensuites. |
Have to remember to tell SS about damaged window. The slider is warped and broken. |
2 comments:
Wow, our houses look pretty much the same, well at the same stage!
It's a race! Lol
All looking good :-)
Bring on plastering & fixing lol
wow its looking great. the build is moving along smoothly. all the best.